SealedCo

PROJECT: WATER LEAKAGE TREATMENT COOLING BED FACTORY RAMP
ICAD Mussafah, Abu Dhabi, UAE

CATEGORY : Manufacturing

DESCRIPTION :
(Rectification of billet cooling bed ramp) – Demolish the damaged concrete and replace it with waterproofed concrete waterproofing crystalline repair system in purpose to handle totally dry ramp. Plant new retaining wall 25 cm thickness surround the ramp to cover all the damaged areas and adding crystalline admixture to the new concrete.